2026 Schuylkill River Trail Projects
Frackville SRT & Trailhead Engineering
- Engineering of the trial alignment from the PA Game Commission- State Game Lands 326 Trailhead to the future Frackville Little League Baseball field trailhead.
Mill Creek SRT Phase 1 Construction
- Construction of 2.75 miles of off-road trail between St. Clair Borough and the PA Game Commission- State Game Lands 326 Trailhead.
Peter Yarnell Landing – Parking and Water Access Improvements
- SRG will regrade and stone the Yarnell parking lot, remove dead trees and replace with new native species, and perform general maintenance on the water landing.
Engineering of the South Front Street SRT Connector in Reading
- SRG and Reading will construct a separate bike lane along S. Front Street, through the RACC campus, and connect the SRT to an existing pedestrian & bike lane on River Road.
Public development of the Reading Gateway Bridge Improvements
- SRG is partnering with Barrio Alegria to facilitate a public design to improve and enhance the Reading Gateway Bridge into a safe and attractive entryway into the City.
Rehabilitation of the Old Church Lane SRT Bridge in Union Township
- The bridge footers, headwalls, and endwalls will be restored to reduce erosion around and under the bridge.
Construction of Reeser’s Landing
- Improvements to Reeser’s Landing will begin this spring and include a new concrete boat launch, trailer parking, and additional vehicle parking for the water landing and Exter Scenic Trail.
Ganshahawny Park Engineering & Construction
- Phase 1 includes the rehabilitation of the exiting boat launch and additional parking. Phase II includes the construction of a new boat launch for trailered watercraft and emergency service access.
2026 Schuylkill River Greenways Events









